ECO Proposals

Improvement proposals from the shop floor

The PLM for Workorder module connects manufacturing processes (Manufacturing) with engineering change management (PLM). This module allows production employees to propose instruction changes directly from Work Orders and automatically creates ECOs to track proposals.

ECO Proposals
Work Orders
Continuous Improvement
Quality Points

Key Benefits

Key points

  • Continuous Improvement: Production employees can propose improvements immediately when issues are discovered

  • Full Traceability: All changes are recorded in ECO with reasons and proposers

  • Automation: System automatically creates ECO and synchronizes changes to new BoM


Update Existing Step Instructions

When executing Work Order and discovering instructions need updating.

Steps

  • 1. Open Work Order in progress.

  • 2. At Quality Check step needing correction, click "Propose Change" button.

  • 3. Select "Update Step".

  • 4. Edit instruction content in Note field.

  • 5. Click "Confirm".


Update Results

Key points

  • System automatically finds or creates ECO for current BoM

  • Change is applied to new BoM in ECO

  • Note is added to chatter of new Quality Point


Remove Unnecessary Step

If a check step is no longer necessary.

Steps

  • 1. At step to remove, click "Propose Change".

  • 2. Select "Remove Step".

  • 3. Enter removal reason.

  • 4. Click "Confirm".


Removal Results

Key points

  • Step is removed from new BoM in ECO

  • Removal reason is recorded in chatter of old step


Add Illustrative Picture

To add picture to clarify instructions.

Steps

  • 1. At step needing picture, click "Propose Change".

  • 2. Select "Set Picture".

  • 3. Capture or upload image.

  • 4. Click "Confirm".


Picture Addition Results

Key points

  • Picture is added to Note of step in new BoM

  • Existing text content is preserved

  • Old picture (if any) is replaced


Add New Check Step

When needing to add check step not in BoM.

Steps

  • 1. In Work Order, click "Add Step" or "+" button.

  • 2. Fill in new step information: Title (step name), Test Type (check type), Note (detailed instructions).

  • 3. Click "Save".


Step Addition Results

Key points

  • System automatically creates ECO if not exists

  • New Quality Point is created in new BoM of ECO

  • New step has title starting with "New Step Suggestion: ..."

  • Step order is automatically arranged according to current check sequence


Access ECO

Steps

  • 1. Go to menu PLM → Engineering Changes.

  • 2. Find ECO named like "Instruction Suggestions (WO-XXX/MO-YYY)".

  • 3. Open ECO to view details.


View Routing Changes

In ECO, there are 2 important tabs to view changes.

Key points

  • Tab "ECO Routing Changes - Operation": Shows Operation changes (add/remove/edit operation)

  • Tab "ECO Routing Changes - Quality Point": Shows Quality Point changes (check steps)


Information in Quality Point Changes

FieldsTrường dữ liệuDescription
Change TypeLoại thay đổiAdd, Update, Remove
StepBướcCheck step name
TitleTiêu đềDetailed title
Step TypeLoại kiểm traCheck type (Instructions, Measure, etc.)
WorkcenterTrung tâm làm việcExecuting work center

View Change Details

Steps

  • 1. In "ECO Routing Changes - Quality Point" tab.

  • 2. Click on change line.

  • 3. Click "Open Quality Point" button (if available).

  • 4. View Note, pictures and change history in chatter.


Approval Process (for PLM Engineers)

Steps

  • 1. Review all changes in ECO.

  • 2. Check Note and reasons in chatter of each Quality Point.

  • 3. Edit if needed (title, content, check type).

  • 4. Move ECO through approval stages.

  • 5. When ready, click "Apply Changes".


Results After Apply

Key points

  • New BoM with updated Quality Points becomes official BoM

  • New Manufacturing Orders will use updated BoM

  • New Work Orders will have improved check steps


Important Notes

Key points

  • Multiple employees can propose changes for same BoM

  • All proposals are merged into one ECO

  • PLM Engineer needs to review and merge duplicate proposals

  • If corresponding step not found in new BoM, system creates Activity reminder


Tips for Production Employees

Key points

  • Propose changes immediately when issues discovered, don't wait until end of shift

  • Write clear reasons for PLM Engineer to understand

  • Take actual pictures on-site for illustration


Tips for Shop Floor Supervisors

Key points

  • Encourage employees to propose improvements

  • Review ECO periodically to track issue trends

  • Coordinate with PLM to prioritize important changes


Tips for PLM Engineers

Key points

  • Check Quality Point chatter to understand context

  • Merge similar proposals from multiple employees

  • Update step titles for clarity before Apply

  • Use Activity to track special cases